Skip, What Steen had was a hub that took a chain, another bolted to the
flywheel on the engine ahead. You rolled the engines so that the two
sprockets lined up and wrapped a double link chain around and installed the
masterlink. the front pair of engines were coupled to a gearbox as were the
rears in the center of the car. Clutch on front and rear ends of the 4X
stack. Roy built all of it including the diffs at each end. He prob has some
spares, or could build you a couple(pun). Bernie
_______________________________________________
Support Team.Net http://www.team.net/donate.html
Land-speed mailing list
http://autox.team.net/mailman/listinfo/land-speed
|