To: | "MGB Newsgroup" <mgb-v8@autox.team.net> |
---|---|
Subject: | Preload |
From: | "Bruce" <brucemills@dccnet.com> |
Date: | Wed, 3 Jan 2001 13:22:56 -0800 |
Reply-to: | "Bruce" <brucemills@dccnet.com> |
Sender: | owner-mgb-v8@autox.team.net |
I am dealing with a Rover 3.5 with hydraulic lifter (new) which have been soaked in oil and the push rod then used to pump them up (air worked out). I found the following on the internet a while ago and it is referring to preload "the gap measured between the spring clip and the top of the push rod is 0.5 - 1.5 mm? All I have done is to put the lifters/push rods and rockers on and torqued them to the specified torque. Is there something else I should have done? Thanks Bruce |
<Prev in Thread] | Current Thread | [Next in Thread> |
---|---|---|
|