Pls explain the different building types you refer to -
- pre-engineered steel - think I understand that
- pole style structure - ?
- or one of its many derivatives - ?
- stick framing - ?
Also when you say "finished outside" what do you mean?
Thx - Derek
Richard Boyce wrote:
> Also consider building a pole style structure or one of its many derivitives
> instead od a preengineered steel building. I built a 1200 sq. ft. shop,
> finished inside and out, with a shingle roof(30 yr) and completely drywalled
> interior, including electrical for 6500.00. This was 5 yrs. ago. I could
> duplicate it today for the same amount. Granted all the labor was furnished
> by me, but it is not hard. Actually easier than stick framing. From the
> inside or out you can't tell it was built pole style. It really is the
> simplest and most economical way to build.
|