| To: | "MGB Newsgroup" <mgb-v8@autox.team.net> | 
|---|---|
| Subject: | Preload | 
| From: | "Bruce" <brucemills@dccnet.com> | 
| Date: | Wed, 3 Jan 2001 13:22:56 -0800 | 
| Reply-to: | "Bruce" <brucemills@dccnet.com> | 
| Sender: | owner-mgb-v8@autox.team.net | 
I am dealing with a Rover 3.5 with hydraulic lifter (new) which have been soaked in oil and the push rod then used to pump them up (air worked out). I found the following on the internet a while ago and it is referring to preload "the gap measured between the spring clip and the top of the push rod is 0.5 - 1.5 mm? All I have done is to put the lifters/push rods and rockers on and torqued them to the specified torque. Is there something else I should have done? Thanks Bruce  | 
| <Prev in Thread] | Current Thread | [Next in Thread> | 
|---|---|---|
  | ||