- 1. Floor pan installation prices (score: 1)
- Author: "Craig D. Niederst" <niederst@telerama.com>
- Date: Wed, 10 May 2000 23:48:17 -0400
- With the '71 B now running and stopping well, its time to get the passenger side floor replaced so I can install my new interior kit. I basically need the old floor removed, and a new pan welded in.
- /html/mgs/2000-05/msg00562.html (6,991 bytes)
- 2. Re: Floor pan installation prices (score: 1)
- Author: Anthony Woodruff <tonymmedia@yahoo.com>
- Date: Thu, 11 May 2000 07:29:15 -0700 (PDT)
- FWIW: I was quoted the following from one of our local MG shops in Tacoma, Washington -- Oh, heck, I'll make a plug for Brookland's British! Weld In Left Side Floor Pan - 4 hours Weld In Right Side F
- /html/mgs/2000-05/msg00574.html (7,952 bytes)
This search system is powered by
Namazu