All I have is a humble unheated 2-car garage, but I would still like to
epoxy-coat the floor. Problem is, I've got so much stuff in there, I can't
empty it out while I do the job---so I wonder if I could do it in two parts.
Like so----First, haul all the stuff over to one side, coat the floor
and wait for it to dry/cure. Then haul the stuff over onto the completed
side and coat the remaining floor. Would this work or would it leave a seam
that would look like s__t forevermore????