| To: | "Mike Rambour" <mikey@b2systems.com>, "Trevor Boicey" |
|---|---|
| Subject: | Re: 2 vs 4 post lifts |
| From: | "fred thomas" <frede.thomas2@verizon.net> |
| Date: | Thu, 01 Feb 2007 15:24:39 -0500 |
Cosr me $1,000. for a "jack-hammer", back end shevel2 men to make forms and pour the concrete, my pit is 6.5 ft deep X 3 ft w. and 14 ft long, with 8 steps going down, 1 metal tray slides along the sides and bottle jacks to lift her up, biggest problem is about 6 neighbors that save money and change their oil/filter, the very best $1,000 I ever spent. "FT" |