Howdy,
So we need to put in a (non-paved due to cost) driveway to the (future)
shop.
We'll have a contractor out for septic work anyway, and were talking with
him about doing the driveway at the same time.
He's willing to do it for time & materials. Time is $80/hour for labor &
machinery. He recommended Limestone as the material, at ~$12.50/ton,
since it ended up being the cheapest (higher per ton cost, but it 'goes
farther' than the other options of mill slag or gravel).
Are those reasonable numbers for this type of work? We don't know much
about these types of projects...
Thanks!
Mark
|