>PE> I have worked on many lathes and milling machines over the years, including

>PE> some big CNC rigs.  I don't think any of them have been bolted to the 
>floor.

>
>A two post lift needs to be bolted down to the floor.  

True.  As I recall, the original post said the space was to used for woodworking
and machine tools.

All I have fastened to the walls are shelves and the workbench which holds the
big vise.  The othe bench and virtually everything else in the shop is on 
wheels.


Phil Ethier

///  unsubscribe/change address requests to majordomo@autox.team.net  or try
///  http://www.team.net/mailman/listinfo
///  Archives at http://www.team.net/cgi-bin/wilma/shop-talk


<Prev in Thread] Current Thread [Next in Thread>