To: | oletrucks@autox.team.net |
---|---|
Subject: | [oletrucks] Hoist/engineering/and so on |
From: | "dph55@pdq.net" <dph55@pdq.net> |
Date: | Mon, 5 Jun 2000 15:47:17 -0500 |
I would suggest that the plan be revised to allow for the hoisting beam to be supported independently from the structure in that type of building. A greater load can be supported from a few columns under the beam with lateral bracing than could ever be held within the standard framing. The cost to modify the structure to allow for the additional load would get out of hand very quickly. Dave Handley 51GMC 5window Houston, Tx |
<Prev in Thread] | Current Thread | [Next in Thread> |
---|---|---|
|
Previous by Date: | Re: [oletrucks] Shop Hoist Engineering Question, Terry Beynon |
---|---|
Next by Date: | Re: [oletrucks] Shop Hoist Engineering Question, Allen Jones |
Previous by Thread: | [oletrucks] C.O.E. Truck Hauler Sighting, Nelson, Jeff - DTC |
Next by Thread: | [oletrucks] ALT, Billy Gibson |
Indexes: | [Date] [Thread] [Top] [All Lists] |