Hi Friends,
This afternoon I got a little more done on the TD. First of all, I
reinstalled the tunnel and attached the handbrake hardware (sans
handle). Here's how it looks, awaiting carpet.
http://www.aubard.us/MGTD/20131028_145319e.jpg
>From there I glued wooden toothpicks in the screw holes in the
sub-dash. I also put a new liner in the glovebox. No pictures there
yet.
I then went back to the engine where I set the float levels in both
carbs, added new screws to the linkage, and installed the overflow
pipes. Nothing other than the float levels is pre-set yet.
http://www.aubard.us/MGTD/20131028_145222.jpg
http://www.aubard.us/MGTD/20131028_145234.jpg
http://www.aubard.us/MGTD/20131028_145246.jpg
-rick
______________________________________________
Mg-t@autox.team.net
Archive: http://www.team.net/archive
|