mg-t
[Top] [All Lists]

Re: fuel line routing

To: Douglas Ormrod <Douglas.Ormrod@neurological.org.nz>,
Subject: Re: fuel line routing
From: John Seim <kingseim@earthlink.net>
Date: Sun, 03 Jul 2005 20:30:51 -0700
Douglas, here is Plan G. Purchase a 5/16" compression union. The MGTC 
has a two piece fuel line, coupled together with a compression union, 
some distance back from the bulkhead panel/firewall of the body tub. No 
leaks, no problems.
John Seim
Irvine, CA
1948 MGTC
1952 MGTD
1955 MGTF 1500 (RHD)

Douglas Ormrod wrote:

>Giday T listers
>
>You may be detecting a pattern here - I spend the weekend trying to put the TD 
>back together and then come to the list with my weekly problem - this week it 
>is the fuel line.
>
>I bought a Moss fuel line with the nuts and little brass flares already in 
>place. Problem is that I can't get it to pass between the pedal box and 
>chassis rail (RHD drive car).  Tried from both ends and it is just too narrow 
>for the nut at the rear of the pedal box just in front of the master cylinder 
>bracket - about 1/16" too narrow. Any one else had this problem? I remember I 
>had to cut the original fuel line in 2 to get it out.
>
>So plan B was to remove the brass flare and re solder it with silver solder 
>after passing it behind the box - problem is these are brazed on and my 
>propane torch is not hot enough to get them off - even if I had oxy I think 
>there would be a high risk of destroying the thing. Brazing copper to brass 
>must be quite a skill!
>
>Plan C was to cut off the end (=" should not make much difference) and fit a 
>new flare after routing the pipe - but it seems Moss do not sell these 
>separately and I am told they are unobtainable in NZ. Anyone know of a 
>supplier?
>
>Plan D was to see if I could remove the flares from the old fuel line - but 
>these are moulded into the copper rather than separate brass fittings. So no 
>joy there.
>
>Plan E is to cut off the brass flare and drill it out to the OD of the pipe 
>and refit it - not sure how feasible that is.
>
>Plan F  - file down two of the flats on the nut till it passes through - but 
>this would weaken it. 
>
>Any suggestions appreciated.
>
>Douglas

///  unsubscribe/change address requests to majordomo@autox.team.net  or try
///  http://www.team.net/mailman/listinfo
///  Archives at http://www.team.net/archive/mg-t


<Prev in Thread] Current Thread [Next in Thread>