Hi Perry-
We hope this move goes as planned without any problems.
The deck must be very strongly built in order to support all that weight
above your 2 project cars. Hopefully they will not be flattened in transit.
Marion Brantley
In a message dated 12/26/2010 1:13:56 A.M. Eastern Standard Time,
healeyguy@aol.com writes:
The Jag MK2 and the 65 AH MK3 projects were loaded via slide back flat
bed truck, then built a deck over them. The extra shrouds and body panels
were
followed by hundreds of boxes. Engine blocks, heads and transmissions were
a
fun part of the load. As I neared the rear doors the equipment, tools etc
and
a couple tons of unboxed stuff littered the can floor. In the end I tossed
(literally) the 100 shock cores and about a 150 brake shoe cores into a
mound
that will greet me when I open the doors in PA in mid January
_______________________________________________
Healeys@autox.team.net
Donate: http://www.team.net/donate.html
Suggested annual donation $12.75
Archive: http://www.team.net/archive
Forums: http://www.team.net/forums
|