healeys
[Top] [All Lists]

Re: [Healeys] Grill assembly order, second request

To: <healeys@autox.team.net>, <wericars@aol.com>
Subject: Re: [Healeys] Grill assembly order, second request
From: "Rich C" <richchrysler@quickclic.net>
Date: Sun, 16 Sep 2007 18:59:08 -0400
Hi Bill,

The upper brow and oval attach in front of the shroud opening with the 
double ended studs with the hex nut surface halfway along the stud length. 
Then with these studs screwed into place, the slat assembly mounting tabs 
run onto the back side of the studs, held with flats, locks and nuts.
On the lower outboard ones, the lower mounting of the inner radiator 
shrouding panels and the steady legs from the outer splash shields also fit 
onto the studs, again held with flats, locks and nuts.

Rich Chrysler

----- Original Message ----- 
From: <wericars@aol.com>
To: <healeys@autox.team.net>
Sent: Sunday, September 16, 2007 2:29 PM
Subject: [Healeys] Grill assembly order, second request


> Hi list, this is a secoond request on the subject.? Can anyone tell me the 
> order of assembly and attachment?of the three parts of the radiator grill 
> to the shroud?? Do they all stack in front of the shroud, or do the slats 
> stack behind the shroud?
>
> Sorry to repeat the question.
>
> Thanks for your time.
>
>
> Bill
> Boston area
> 65 BJ8
>
> ________________________________________________________________________
> Email and AIM finally together. You've gotta check out free AOL Mail! - 
> http://mail.aol.com
> _______________________________________________
> richchrysler@quickclic.net
>
> Healeys@autox.team.net
> http://autox.team.net/mailman/listinfo/healeys
_______________________________________________

Healeys@autox.team.net
http://autox.team.net/mailman/listinfo/healeys

<Prev in Thread] Current Thread [Next in Thread>